Miguel Servet Building

WALQA Technology Park, Huesca

In this case, a prefabricated boiler room was placed on deck and installed with all its elements running on Propane Gas. This boiler room is composed of boilers, pumping group, gas detection and digital supervision control.

In addition, a network of pipes made of insulated PPR and finished in aluminum was installed, which run through the roof to connect the existing air conditioning installation in the NORTH ZONE and the SOUTH ZONE of the building.