top of page

Hospital Quirón Salud

Tenerife

​In this project, we have carried out the comprehensive reform of the hospital's thermal production, including the civil works necessary to implement the system, supplying the air conditioning installation. It was carried out by taking advantage of the heat recovery from the chillers for the free supply of DHW and the automation of the operation of the installation. Both the selection of the cold and heat production equipment and the optimized design of the installation provide significant energy savings.

bottom of page