top of page

Hotel Costa Gomera

La Gomera

Air conditioning installation using a water-water system, which has three chiller plants, heat pumps, with heat emission and use for the production of domestic hot water, or if not needed, it will be diverted to four heat sinks. In addition, a heat recovery system from the technical production equipment has been included, used for the preheating of DHW, as well as two high-performance heat pumps.

SCI Group

Installation and Maintenance of Air Conditioning

  • LinkedIn
  • Facebook
  • Instagram

Legal warning

Privacy Policy

©2024 por Servicio y Calidad de Instalaciones S.L.

Cookie Policy

logo de nuestra empresa
bottom of page