​In this project, the air conditioning and ventilation of the warehouse and office areas was carried out. A total of 1,100 kW were installed using DAIKIN VRV equipment. The offices have cassette equipment and sensible heat recovery units with plate exchangers. The warehouse area, which is very high and has a large surface area and no false ceiling, was fitted with 42 high-pressure duct units available, with 28 kW of cooling capacity, model FXMQ250A. Each duct unit had an insulated sheet metal plenum, Totem type, with temperature-regulating air supply nozzles.